CATERPILLAR CHP PLANTS
Two (2) 1036 KW Caterpillar 3516 CHP Power Plants
50 HZ, 400 volt, 1500 rpm, year 1994, total hours 67,000 hrs major overhaul at 40,000 hrs. At 60,000 hrs middle overhaul was done and new cylinder heads installed on engines. Generator sets we under Caterpillar service contract since new complete sets with cables, control panels, exhaust heat exchanger, exhaust silencers, pumps, oil bar, plate heat exchanger, low temperature exhaust heat exchanger and all documentation.
Ref. 71276
42 MW LM 6000 DUAL FUEL GAS TURBINE, 50 HZ
Major overhaul and changed to dual fuel (Gas & Diesel) wih upgrades of HPT and LPT. Natural gas compressor from 0.85MPA boost up to 4.6 Mpa, flow rate : 12000 cbm/hr, total running hours : 3200 hour
Ref. 71277
WARTSILA DIESEL ENGINE POWER PLANT
4sets of Wartsila 6300KW 60HZ HFO
Diesel Engine Power plant
Total output : 25.2MW
Quantity : 6300KW X 4SETS
Engine
Maker: Wartsila
Year: 1995
Model: 18V32
Output: 6,660KW
Revolution: 720Rpm
Generator
Maker : ABB
Year : 1995
Output : 6,300KW(7,875KVA)
Frequency : 60HZ
Voltage : 11,000V
Fuel : HFO
Particulars
Total Used hours: 64,000Hrs-Each
Power plant started : 1997year
Power plant stopped : 2007year
Ref. 71294
2 X NEW GE/NUOVO PIGNONE TURBINE/COMPRESSOR PACKAGES FOR SALE
Turbine Drivers 2 available Model - GE PGT LM 2500+G4 SAC
■ 34MW
■ 6,100 RPM output shaft speed
■ Plus one spare gas turbine
Gas Compressors 2 available Model - Nuovo Pignone 2BCL406/C
■ Discharge pressure – 350 bar
■ Inlet flow rate – 5,700 actual M3/hour ■ RPM range 8,000 - 12,000
■ Polytropic head 93 kJ/kg ■ Plus one spare compressor bundle
■ Inlet filtration housing and ducting ■ High efficiency inlet air filtration system
■ Exhaust ducting, silencer & stack ■ Common structural skid 3 points mount
■ Water mist extinguishing system ■ Central Fire & Gas control panel logic
■ Full load, full speed, hydrocarbon string test for one unit
■ Turbine and compressor special tools
■ GT on-base enclosure ■ Synthetic and Mineral Oil Mist Separator
■ Synthetic and Mineral Plate Oil Coolers
■ DC Panel and Battery ■ GT GC & HSPT and Gearbox Operational Spares
■ Commissioning and Start-Up Spares as listed
■ Spare compressor bundle (tested) included
■ Spare gas generator (tested)
LM2500-G4 Turbine/Compressor Packages 2 available
■ Turbine and compressor control panels
■ Bently Nevada 3500 vibration monitoring system and control
■ Operator interfaces (HMIs)
■ Performance Control and Load Sharing System
■ Electro Hydraulic type starting system (1 for each skid)
■ Online/Offline washing trolley system (1 common for both GTG skids)
■ Load Gearbox
■ High speed and low speed couplings with guards
■ Common, Special Purpose synthetic grade oil lubrication and control oil system for the gas
turbine, gearbox and compressor
■ Compressor 2BCL406/C, 2 stage barrel
■ Inlet ducting with weather hood and silencer
Ref. 712162