LEE WILSON BELL ANNEALING FURNACES
(2) LEE WILSON BELL ANNEALING FURNACES
Gas Fired
108" (2793mm) Dia.
80" (2032mm) High
(2) Furnaces
(4) Bases
(4) Retorts
All Controls, Instrumentation
Ref.CGS101321
Bielloni 3 Layer Co-extrusion Line
Bielloni 3 Layer Co-extrusion Line
Details:- Type: Bielloni
- Materials to be processed: LLDPE/LDPE/LLD/other blends.
- Extruders: Extruders: 1x60 + 1x80 + 1x60 mm
- Head: 3-Layer blown film die head
- Die diameter 400 mm + 350 mm IBC
- Die Gap: 1.8 mm
- Output: Up to 350 kg/hour depending on material formulation
- Air ring: single flow air ring
- Take off: Take off 1600 mm wide
Rewind:
- Double winder, fully automatic back to back rewinder
- Reels diameter up to 600 mm
- Winding width 1.600 mm
Accessories:
- Calibrating basket
- Corona-treater
- Air shafts (2)
- Fabrication year: 1993
Ref.CGS101324
Eumuco Rw1 Rolling Mill
EUMUCO Rolling mill
Mod: RW1
Diameter of pistons to roll: mm. 370
Cylinder’s width: mm. 500
Max. length to roll: mm. 570
Cylinder’s rpm: g.p.m. 80
Max. material allowed: mm. 55
For forging press to drop-forge with push’s capacity of 2500-4000 kgm
For press to drop-forge with pressure of 2000 t.
Puissance: 20 CV
Engine’s speed: g.p.m. 1500
Weight of machine: kg. 5300
Ref.CGS101327
IHI Japan E.A F 30 Tons Meltshop
E.A F 30 tons meltshop
Make IHI Japan
Year 1974
brief description
capacity upto 40 tons
30 tons/heat(rated) 37 tons( actual)
300,000 tons /year
revamped in year 2004, 2008 and 2012
CCM Sumitomo REvamped in 2004 by Kobe steel S( bow) type
No of stands: 4
products : billet( 120 x 120 mm)
dust collector Dongguk year 2010 closed type
16,600 m3/min
re bar mills Kobelco bar size : 10" and 13"
( 350,000 tons/year) Billet size : 120 mm x 3.5 meters To be offered separately ,
Re heating furnace : 70 tons/HR Delievered beginning of 2014
Pusher type ,22 x 4 meters, LNG gas
Rolling mill : Pass No; 18, Speed :13.07M/Sec
2 strands
Cooling bed :Trough type , 60 X 9 meters
AC furnace , Swing type
60Hz
in year 2004 , followings are revamped
capacity upto 40 tons by Nikko Japan
transformer newly installed, Elec control
panel( Toshiba) replaced
in yeaer 2008 Flare stack replaced
2012 carbon wire injection machine replaced
Ref. CGS101337